Leviton LP220-BPD

Leviton LP220-BPD 20 Space, 200 Amp ศูนย์โหลดในร่ม

คู่มือการใช้งาน

การแนะนำ

This manual provides essential information for the safe and proper installation, operation, and maintenance of your Leviton LP220-BPD 20 Space, 20 Circuit Indoor Load Center with a 200 Amp Main Circuit Breaker. Please read all instructions carefully before beginning any work. This load center is designed for indoor use and is NEMA 1 rated. The enclosure and interior are included; the door is sold separately.

ข้อมูลด้านความปลอดภัย

คำเตือน: Risk of electric shock or electrocution. Installation and servicing of this electrical equipment must be performed by a qualified electrician in accordance with all national and local electrical codes. Always turn off power at the main service disconnect before working on the load center. Use appropriate personal protective equipment (PPE).

สินค้าเกินview

The Leviton LP220-BPD Load Center offers a modern, efficient solution for residential electrical distribution. Key features include:

Leviton LP220-BPD Load Center with dimensions

Image 1: Leviton LP220-BPD Load Center showing overall dimensions (14.25"L x 4"W x 30"H) and key specifications like 200 Amps, 20 Spaces/Circuits, Main Breaker Included, and NEMA 1 Indoor rating.

ภายใน view of Leviton LP220-BPD Load Center showing wiring features

ภาพที่ 2: ภายใน view of the load center highlighting features such as notches for cable ties, white powder-coated finish, included main breaker, custom lugs for hot and neutral wires, tin-plated copper bussing, and invertibility for bottom feed applications.

การติดตั้งและการตั้งค่า

Installation should only be performed by a qualified electrician. Follow all applicable electrical codes.

1. การติดตั้งแผงควบคุมโหลด

  1. Choose a suitable indoor location for flush or surface mounting, ensuring adequate clearance around the panel.
  2. Securely mount the load center enclosure to the wall studs or appropriate structural support.

2. Wiring at Rough-in

  1. With no circuit breakers present, neatly land all branch phase and neutral wires directly onto the panel's custom lugs.
  2. Utilize the stamped notches for cable ties to organize and secure wiring within the enclosure.
  3. Ensure all connections are tight and conform to torque specifications.

3. Installing Circuit Breakers

Leviton's plug-on design allows for quick and easy installation of circuit breakers.

  1. Align the Leviton circuit breaker with the desired space on the bussing.
  2. Firmly snap the breaker into place. No additional wiring is required for the breaker itself.
  3. Repeat for all necessary circuit breakers.
Hand installing a Leviton circuit breaker into the load center

Image 3: A hand demonstrating the plug-on installation of a Leviton circuit breaker into the load center, emphasizing the ease and speed of installation.

4. Main Breaker Customization

The modular panel design and 225 Amp rated bussing allow for in-field main breaker customization, providing flexibility for future upgrades.

Video 1: Official Leviton Load Center Video. This video demonstrates the key features and installation benefits of the Leviton Load Center, including the easy wiring at rough-in, plug-on circuit breakers, and modular design for future upgrades.

Operating the Load Center

Once installed, the load center operates like a standard electrical panel. Circuit breakers protect individual circuits from overcurrents and short circuits.

Resetting a Tripped Circuit Breaker

  1. Locate the tripped breaker, which will typically be in an intermediate position between 'ON' and 'OFF'.
  2. Firmly push the breaker handle to the full 'OFF' position.
  3. Then, push the handle to the full 'ON' position to restore power.
  4. If the breaker immediately trips again, there may be a persistent fault. Do not attempt to reset it repeatedly. Consult a qualified electrician.

การซ่อมบำรุง

The Leviton Load Center requires minimal maintenance. Regular inspections by a qualified electrician are recommended.

Two types of Leviton load center doors, standard and window, sold separately

Image 4: Illustration of two types of doors for the Leviton Load Center: a standard solid door (LDC20) and a windowed door (LDC20-W), both sold separately.

การแก้ไขปัญหา

For persistent electrical issues, always consult a qualified electrician.

ปัญหาสาเหตุที่เป็นไปได้สารละลาย
เซอร์กิตเบรกเกอร์ตัดบ่อยวงจรไฟฟ้าเกินกำลัง, ไฟฟ้าลัดวงจร, ไฟรั่วลงดิน หรือเครื่องใช้ไฟฟ้าชำรุดReduce load on the circuit. Unplug appliances. If problem persists, consult an electrician.
ไม่มีกระแสไฟฟ้าเข้าสู่วงจรTripped circuit breaker, loose connection, or power outage.Check and reset the circuit breaker. Verify main power supply. If issue continues, contact an electrician.
แผงควบคุมไฟฟ้ารู้สึกอุ่นNormal operation under load, or potentially loose connections/overload.A slight warmth is normal. If excessively hot or accompanied by burning smell, immediately turn off main power and call an electrician.

ข้อมูลจำเพาะ

คุณลักษณะรายละเอียด
ยี่ห้อเลวีตัน
หมายเลขรุ่นLP220-BPD
ขนาดสินค้ายาว 14.25 นิ้ว x กว้าง 4 นิ้ว x สูง 30 นิ้ว
กระแสไฟของอะแดปเตอร์ AC200 Amps
วัสดุทองแดง
จำนวนวงจร20
ประเภทเฟสเฟสเดียว
น้ำหนักสินค้า22.7 ปอนด์
ยูพีซี078477996188

Smart Home Integration (Optional)

The Leviton Load Center is compatible with optional smart upgrades, allowing for enhanced energy management and control. This includes the ability to install Leviton Whole Home Energy Monitors and 2nd Gen Smart Circuit Breakers, which can be enrolled in the My Leviton App.

Diagram showing steps for Leviton smart home integration

Image 5: A diagram illustrating the three steps for smart home integration: 1) Install the Leviton Whole Home Energy Monitor, 2) Snap in 2nd Gen Smart Circuit Breakers, and 3) Enroll Breakers in the My Leviton App.

การรับประกันและการสนับสนุน

For specific warranty details and customer support, please refer to the official Leviton website or contact Leviton customer service directly. Keep your purchase receipt for warranty claims.

Leviton offers various protection plans for their products. For more information on available protection plans, please visit the Leviton webดูรายละเอียดเพิ่มเติมได้ที่เว็บไซต์ หรือสอบถามจากผู้ค้าปลีก

เอกสารที่เกี่ยวข้อง - LP220-BPD

พรีview คู่มือการติดตั้งตู้ควบคุมไฟฟ้า Leviton
คู่มือการติดตั้งโดยละเอียดสำหรับตู้ควบคุมไฟฟ้า Leviton รุ่น LP2xx, LP3xx, LP4xx และ LP6xx ครอบคลุมหัวข้อความปลอดภัย การถอดช่องเจาะ การติดตั้ง การเดินสายไฟ การติดตั้งเบรกเกอร์วงจรย่อย และการติดตั้งฝาครอบ
พรีview คู่มือการติดตั้งแผนผังเฟสของศูนย์โหลด Leviton
คู่มือนี้มีภาพประกอบแผนผังขั้นตอนเพื่อช่วยให้การติดตั้งเครื่องตรวจสอบการใช้พลังงานทั้งบ้านของ Leviton (LWHEM) ง่ายขึ้น โดยจะอธิบายรายละเอียดเกี่ยวกับการต่อสายไฟและการติดตั้งตัวแปลงกระแสไฟฟ้า (CT) สำหรับอุปกรณ์เสริมการวัดกระแสไฟฟ้าอัจฉริยะ เพื่อตรวจสอบการใช้พลังงานทั้งบ้าน
พรีview คู่มือแอป Leviton ของฉัน: ควบคุมอุปกรณ์สมาร์ทโฮมของคุณ
ศึกษาคู่มือแอป My Leviton เพื่อลงทะเบียน เชื่อมต่อ และปรับแต่งอุปกรณ์ Decora Smart Wi-Fi และ Leviton Load Center พร้อม Smart Breakers ได้อย่างง่ายดาย เพื่อการควบคุมบ้านอัจฉริยะที่ราบรื่น
พรีview คู่มือการติดตั้งและการทดสอบเต้ารับ GFCI ของ Leviton
คู่มือฉบับสมบูรณ์เกี่ยวกับการติดตั้งและทดสอบเต้ารับ GFCI รุ่น Leviton SmartLock Pro รวมถึงคำแนะนำในการเดินสายไฟ ข้อควรระวังด้านความปลอดภัย และเคล็ดลับในการแก้ไขปัญหา
พรีview คู่มือแอป My Leviton: การควบคุมบ้านอัจฉริยะสำหรับ Decora Smart Wi-Fi และตู้ควบคุมไฟฟ้า
คู่มือฉบับสมบูรณ์สำหรับการใช้งานแอป My Leviton เพื่อจัดการอุปกรณ์ Leviton Decora Smart Wi-Fi และตู้ควบคุมไฟฟ้า Leviton Load Centers พร้อมเบรกเกอร์อัจฉริยะ ครอบคลุมการตั้งค่า ตารางเวลา กิจกรรม การตั้งค่าอุปกรณ์ การปรับแต่งแดชบอร์ด การตรวจสอบพลังงาน และการสนับสนุนลูกค้า
พรีview คู่มือแอป Leviton ของฉัน: Decora Smart Wi-Fi และ Load Center
คู่มือฉบับสมบูรณ์สำหรับการใช้งานแอป My Leviton เพื่อจัดการอุปกรณ์ Leviton Decora Smart Wi-Fi และตู้ควบคุมไฟฟ้า Leviton พร้อมเบรกเกอร์อัจฉริยะ เรียนรู้เกี่ยวกับการตั้งค่า การจัดการอุปกรณ์ การตั้งเวลา การตรวจสอบการใช้พลังงาน และการสนับสนุนลูกค้า