Fill-Rite KIT120FLG

Fill-Rite KIT120FLG 1-Inch Meter Flange Assembly Kit User Manual

For FR4200 and FR4400 Series Pumps

1. สินค้าหมดview

The Fill-Rite KIT120FLG is a 1-inch meter flange assembly kit designed for use with Fill-Rite FR4200 and FR4400 series pumps. This kit provides essential components for mounting a meter, serving as a cost-effective solution for pump repair and extending equipment lifespan. It includes certified OEM parts to ensure compatibility and reliable performance.

This kit replaces the older 305F0998 flange.

1.1 เนื้อหาบรรจุภัณฑ์

The KIT120FLG package typically includes the following components:

  • Meter Flange (Red, as shown in image)
  • โอริง
  • Bolts (for attaching the meter to the flange)
Fill-Rite KIT120FLG components: red meter flange, O-ring, and various bolts.

รูปที่ 1: Components of the Fill-Rite KIT120FLG kit, including the red flange, O-ring, and bolts.

2. ข้อมูลด้านความปลอดภัย

Always observe the following safety precautions when handling, installing, or maintaining the KIT120FLG meter flange assembly:

  • Ensure the pump system is de-pressurized and drained before beginning any installation or maintenance.
  • Disconnect power to the pump to prevent accidental operation.
  • สวมใส่อุปกรณ์ป้องกันส่วนบุคคล (PPE) ที่เหมาะสม เช่น แว่นตานิรภัยและถุงมือ
  • Refer to the main pump manual for specific safety guidelines related to your FR4200 or FR4400 series pump.
  • โปรดจัดการชิ้นส่วนอย่างระมัดระวังเพื่อหลีกเลี่ยงความเสียหายหรือการบาดเจ็บ

3. คำแนะนำในการติดตั้ง

Follow these steps to properly install the KIT120FLG meter flange assembly:

  1. เตรียมปั๊ม: Ensure the FR4200 or FR4400 series pump is turned off, de-pressurized, and any fuel or fluid lines are disconnected from the area where the flange will be installed.
  2. Remove Existing Flange (if applicable): If replacing an old flange, carefully remove the existing bolts and flange, ensuring no debris enters the pump or lines.
  3. Position the O-Ring: Place the O-ring onto the meter side of the new KIT120FLG flange. Ensure it is seated correctly to create a proper seal.
  4. Connect to Pump Discharge: Using a pipe nipple (not included), connect the inlet of the meter flange to the pump's discharge port. Ensure a secure, leak-free connection.
  5. ติดตั้งมิเตอร์: Align the meter (not included) with the flange. Use the provided bolts (typically four) to securely attach the meter to the flange. Tighten bolts evenly to prevent stress on the components and ensure a tight seal.
  6. ตรวจสอบการเชื่อมต่อ: ตรวจสอบการเชื่อมต่อทั้งหมดอีกครั้งเพื่อดูความแน่นและการจัดตำแหน่งที่เหมาะสม
  7. การทดสอบการรั่วไหล: After installation, slowly re-pressurize the system and carefully inspect for any leaks around the flange and meter connections. Address any leaks immediately.
Diagram showing the assembly of the meter flange, O-ring, and bolts, with labels for meter side and pump discharge connection.

รูปที่ 2: ระเบิด view diagram illustrating the assembly of the KIT120FLG meter flange, O-ring, and bolts for connection to a meter and pump discharge.

4. การดำเนินการ

Once properly installed, the KIT120FLG meter flange assembly facilitates the connection of a compatible meter to your Fill-Rite FR4200 or FR4400 series pump. The flange ensures a secure and sealed pathway for fluid transfer, allowing the connected meter to accurately measure the dispensed volume. Operation of the meter itself will depend on the specific meter model used.

5. การบำรุงรักษา

Regular maintenance of the meter flange assembly ensures optimal performance and longevity:

  • การตรวจสอบเป็นระยะ: Regularly inspect the flange, O-ring, and bolts for any signs of wear, corrosion, or damage. Check for leaks around the connections.
  • การเปลี่ยนโอริง: The O-ring is a critical sealing component. Replace it if it shows signs of cracking, hardening, or compression set, or if leaks are detected.
  • การทำความสะอาด: Keep the exterior of the flange clean from dirt, debris, and fluid residue.
  • ความรัดกุม: Periodically check the tightness of the bolts securing the meter to the flange. Do not overtighten.

6 การแก้ไขปัญหา

If you encounter issues with your KIT120FLG meter flange assembly, consider the following:

ปัญหา สาเหตุที่เป็นไปได้ สารละลาย
การรั่วไหลของของเหลว Damaged or improperly seated O-ring; loose bolts; damaged flange. Ensure O-ring is correctly positioned and undamaged. Tighten bolts evenly. Inspect flange for cracks or damage; replace if necessary.
Meter not seating properly Misalignment; debris in connection; damaged threads. Re-align meter and flange. Clean connection surfaces. Inspect threads for damage.

7. ข้อมูลจำเพาะ

คุณสมบัติ รายละเอียด
หมายเลขรุ่น KIT120FLG
ประเภทสินค้า Mechanical Component (Meter Flange Assembly Kit)
ความเข้ากันได้ Fill-Rite FR4200 and FR4400 Series Pumps
ขนาดหน้าแปลน 1 นิ้ว
วัสดุ อลูมิเนียม
ขนาดแพ็คเกจ 4.72 x 3.62 x 3.35 นิ้ว (ประมาณ 12.0 x 9.2 x 8.5 ซม.)
น้ำหนักแพ็คเกจ 0.324 กก. (ประมาณ 11.4 ออนซ์)
ประเทศต้นกำเนิด ประเทศสหรัฐอเมริกา

8. การรับประกันและการสนับสนุน

Fill-Rite provides certified OEM parts, ensuring quality and compatibility. For specific warranty information regarding the KIT120FLG or your Fill-Rite pump, please refer to the documentation provided with your original pump purchase or contact Fill-Rite customer support directly.

For technical assistance or to inquire about replacement parts, please visit the official Fill-Rite webไซต์หรือติดต่อศูนย์บริการที่ได้รับอนุญาต

เอกสารที่เกี่ยวข้อง - KIT120FLG

พรีview ปั๊มถ่ายเทเชื้อเพลิง Fill-Rite SD1202H: คำแนะนำในการติดตั้งและการใช้งาน
คำแนะนำการติดตั้งและการใช้งานที่ครอบคลุมสำหรับปั๊มถ่ายเทเชื้อเพลิง Fill-Rite SD1202H 12 โวลต์ DC ซึ่งรวมถึงชิ้นส่วน แผนผังสายไฟ และข้อควรระวังด้านความปลอดภัย ครอบคลุมรุ่น FR1200, FR2400, FR4200, FR4400, FR600, SD1200 และ SD600
พรีview คู่มือการติดตั้งและการใช้งานปั๊มถ่ายเทเชื้อเพลิง Fill-Rite รุ่น H-Series
คู่มือฉบับสมบูรณ์สำหรับปั๊มถ่ายเทเชื้อเพลิง Fill-Rite รุ่น H-Series (FR1200, FR2400, FR4200, FR4400, FR600, SD1200, SD600) ครอบคลุมการติดตั้ง การใช้งาน ความปลอดภัย การแก้ไขปัญหา ข้อมูลจำเพาะ และอุปกรณ์เสริมต่างๆ มาพร้อมคำแนะนำการเดินสายไฟ DC และ AC
พรีview ปั๊มถ่ายเทเชื้อเพลิงกระแสสลับ Fill-Rite ซีรีส์ NX25-120 และ NX25-240: คู่มือการติดตั้งและการใช้งาน
คู่มือการติดตั้งและการใช้งานฉบับสมบูรณ์สำหรับปั๊มถ่ายเทเชื้อเพลิงกระแสสลับ Fill-Rite รุ่น NX25-120 และ NX25-240 ครอบคลุมข้อมูลด้านความปลอดภัย การติดตั้ง การใช้งาน การบำรุงรักษา และข้อมูลเฉพาะรุ่น
พรีview Fill-Rite FR20V, FRHP32V, FRAP32V Hand and Air Operated Pumps Installation and Operation Manual
Comprehensive installation and operation manual for Fill-Rite FR20V, FRHP32V, and FRAP32V hand and air-operated fuel transfer pumps. Covers safety precautions, installation procedures, troubleshooting, technical specifications, fluid compatibility, and warranty information.
พรีview คู่มือการติดตั้งและการใช้งานปั๊มถ่ายโอน DEF รุ่น Fill-Rite DF
คู่มือการติดตั้งและการใช้งานฉบับสมบูรณ์สำหรับปั๊มถ่ายโอน DEF รุ่น Fill-Rite DF ครอบคลุมด้านความปลอดภัย ข้อมูลผลิตภัณฑ์ ขั้นตอนการติดตั้งสำหรับถัง IBC/Tote และถัง/บาร์เรล การเดินสายไฟ การทำงานของปั๊ม การแก้ไขปัญหา และรายการชิ้นส่วน
พรีview นโยบายการรับประกันสินค้าของ Fill-Rite - ขอบเขตความคุ้มครองและระยะเวลา
นโยบายการรับประกันที่ครอบคลุมจาก Fill-Rite ระบุรายละเอียดระยะเวลาและเงื่อนไขการคุ้มครองสำหรับผลิตภัณฑ์ซีรีส์ต่างๆ ที่ซื้อก่อนและหลังวันที่ 1 กรกฎาคม 2019 รวมถึงการรับประกันเฉพาะชิ้นส่วนและข้อยกเว้นต่างๆ